This is NOT the current version of this contract - Limited stock


THIS CONTRACT IS FOR USE IN ENGLAND, FOR SCOTLAND SEE SBCC CONTRACTS

The JCT Contracts 2011 edition reflects new payment legislation and makes other changes which include:

  • A revised Insolvency definition in the Termination section
  • The revised Terrorism Cover provisions that were included in JCT's December 2009 Update
  • The provision for appointment of the principal contractor under CDM Regulations has been extended to cover that function under the Site Waste Management Plans Regulations 2008
  • Statutory reference to the Bribery Act 2010
  • Entries in respect of PI insurance relating to asbestos and fungal mould have been removed
  • Revised retention provisions in the sub-contracts

Management Building Contract MC 2011

Appropriate:

  • For large-scale projects requiring an early start on site, where the works are designed by or on behalf of the Employer but where it is not possible to prepare full design information before the works commence and where much of the detail design may be of a sophisticated or innovative nature requiring proprietary systems or components designed by specialists
  • Where the Employer is to provide the Contractor with drawings and a specification
  • Where a Management Contractor is to administer the conditions
  • The Management Contractor does not carry out any construction work but manages the Contract for a fee
  • The Management Contractor employs Works Contractors to carry out the construction works

Can be used:

  • Where the works are to be carried out in sections
  • By both private and local authority employers